XEVNEO
Frequently Asked Questions
Answers to the questions international buyers ask most about transformer procurement.
Procurement Questions
Q: Are you a manufacturer?
A: We are a certified trading company sourcing from ISO9001-certified factories in China. This model gives you factory-direct pricing plus independent quality control — our QC team inspects every shipment before it leaves.
Q: What certification do you provide?
A: IEC 60076 type test reports, CE and CB certificates, plus optional third-party inspection (SGS/BV/TÜV). For Indonesia, we support the SNI certification process.
Q: What is the minimum order quantity?
A: From 1 unit for standard models. Custom designs (special voltage, winding, protection) may require larger quantities.
Q: What is the lead time?
A: 45–75 days for standard distribution transformers, 90–150 days for power transformers (110 kV+), depending on capacity and customization.
Q: What payment terms do you accept?
A: Standard: 30% deposit to start production, 70% against shipping documents (FOB/CIF). Letter of Credit is available for larger orders.
Q: Which countries do you export to?
A: Vietnam, Indonesia, Philippines, Malaysia and other Southeast Asian markets, with capability to ship worldwide.
Q: Can you customize transformers for our project?
A: Yes — voltage, cooling type, loss levels, impedance, vector group, anti-corrosion and high-altitude protection are all customizable.
Q: Do you support Vietnam’s TCVN requirements?
A: Yes. IEC 60076 with type test reports is the accepted technical basis for the Vietnamese market; we can arrange documentation to match project requirements.
Q: Can we arrange factory inspection?
A: Absolutely. You can visit the factory or we can arrange third-party inspection (SGS/BV/TÜV) and FAT with your engineers present.
Q: What after-sales support do you provide?
A: 24-month warranty, technical documentation (drawings, test reports, installation guides), remote support, spare parts, and on-site commissioning for major projects.
